Direct Recruitment of 113 Divisional Accounts Officers



GOVERNMENT OF ANDHRA PRADESH
A B S T R A C T
Public Services–Andhra Pradesh Works Accounts Services–Recruitment (Direct)–
Divisional accounts Officers Grade II–imparting of training to the newly recruited DAO
(W)s–creation of supernumerary posts for 113 posts of DAO (W) Grade. II–Orders–
Issued.
FINANCE (WA-II) DEPARTMENT
G. O. Ms. No. 180                                              Dated:06-07-2012.
Read the following:-
1) G. O. Rt. No. 2435, Finance (WA.II) Department, dated 11.05.2012.
2) From the Director of Works Accounts Lr. No.DWA/Hyd/EC.1/2012-13/215,
Dated 29.05.2012.
3) G.O. Ms No. 157, Finance (WA.II) Department, dated 15.06.2012
                                                                   ***
O R D E R:
The Director of Works Accounts, Hyderabad in the reference 2nd read above stated that the Andhra Pradesh Public Service Commission, Hyderabad allotted 118 selected candidates of DAO (W) Grade-II under direct Recruitment in their Letter No. 1313/RS- 15/2007, dated 21.04.2012 and Letter No. 1374/RS-15/2008, dated 21.04.2012. Accordingly, he issued appointment orders to all the candidates on 24.04.2012 and 25.04.2012 with instructions to report for duty within 30 days from the date of dispatch. Out of 118 candidates, 113 candidates have reported to duty. The individuals who
reported for duty upto 13.05.2012 are 86 and they have been sent to Dr. MCRHRD Institute, Hyderabad to attend the training programme from 14.05.2012 onwards for a period of four months. The candidates subsequently reported for duty on different dates upto 24.05.2012, 27 in number have also been sent for training at the institute. After training at Dr. MCRHRD Institute for a 4 month period is over, they have to attend the field training for a period of two months as per the orders issued in the reference 1st read above. The total period of training is for six months i.e., from 14.05.2012 to 13.11.2012
vide orders issued in the reference 3rd read above. The posts of the DAO (W) are being sanctioned in the PWD Engineering Department like R&B, PR, RWS, Irrigation, Projects and Public Health etc. Hence the above posts form a part and parcel along with other regular engineering staff working under the control of the respective Chief Engineers. There are sufficient vacancies of DAO (W) Grade-II in the various Engineering Divisions in the State. They will be posted to various Divisions in the State after completion of their total training.

2. It is also stated by the Director of Works Accounts that the pay scale for the post of the DAO (W) Grade-II is Rs.15280-40510. They are being allowed the minimum Basic Pay + usual Allowances as applicable from time to time. An amount of Rs: 1, 87, 55,827.00 will be incurred towards salaries as on date as per the details given below:
Pay– Rs.15280 + D.A. (35.952%)–5493 +
HRA (30%)–4584 + CCA–350                                         = Total Rs.25,707/-
Expenditure from 26.04.2012 to 13.05.2012 (18 days) for
86 candidates (86x 25,707.00x18/30)                                      = Rs.13,26,481/-
Expenditure from 14.05.2012 to 13.11.2012 (6 months) for
113 candidates (113x 25,707.00x6)                                    = Rs.1,74,29,346/-
                                                                 Total Expenditure = Rs.1,87,55,827/-

3. Therefore the Director of Works Accounts requested to create 113 supernumerary posts of DAO (W) Grade-II and accord permission for drawing the salaries of the reported DAOs (W) from 26-04-2012 to 13-05-2012 (18 days) including training period ie., from 26-04-2012 to 13.11.2012

4. Government after careful examination of the proposals of the Director of Works Accounts hereby create (113) supernumerary posts in the category of Divisional Accounts Officers (W) Grade-II in the Directorate of Director of Works Accounts and accord permission for drawing the salaries of the reported DAOs (W) from 26.04.2012 to 13.05.2012 (18) days including the training period ie from 26.04.2012 to 13.11.2012. The expenditure on account of salaries and allowances will be met from the Head of Account
2054-00-001-00-01-010 Salaries. The Director of Works Accounts will submit the necessary proposals to include the additional expenditure due to creation of these supernumerary posts in the Revised Estimates 2012-2013 at appropriate time.

5. The Director of Works Accounts, Hyderabad shall take necessary action in the matter. This orders issued with the concurrence of Finance (SMPC.I) Department vide their U.O. No. 15910-B/559/A3/SMPC.I/12, dated 23.06.2012.

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
L. PREMACHADNRA REDDY,
SECRETARY TO GOVERNMENT (W&P)

No comments

Powered by Blogger.