Suresh Prabhu Flags Off First Passenger Carrying Train Between Silchar – Guwahati
Suresh Prabhu Flags Off First Passenger Carrying Train Between Silchar –
Guwahati Through The Newly Constructed Broad Gauge Section Lumbding –Silchar in
Assam
The Flag Off Of The New Train Was Done Through Remote Control From Delhi By Organizing A Video Conferencing Between Rail Bhawan, New Delhi And Silchar Railway Station In Assam
The Flag Off Of The New Train Was Done Through Remote Control From Delhi By Organizing A Video Conferencing Between Rail Bhawan, New Delhi And Silchar Railway Station In Assam
The Union Minister of State
(Independent Charge) for Youth Affaires and Sports Shri Sarbananda Sonowal
and Minister
of State for Railways Shri Manoj Sinha Attended the Programme At Silchar
Railway Station End.
The Move Fulfils The Long Cherished Demand Of The
People Of Barak Valley In South Assam To Have A Seamless Connectivity With Rest
Of The Nation
This Line Leads To Opening Of New Vistas In
Connection To The Hitherto Isolated States Of Tripura, Mizoram And Manipur
The Union Minister of Railways, Shri Suresh Prabhakar Prabhu,
flagged off the First BG Fast Passenger Train from Silchar to
Guwahati via Lumding, Haflong through Remote Control by organizing a Video-Conferencing between Rail
Bhawan, New Delhi and Silchar Railway Station. The Union Minister of State (Independent Charge) for
Youth Affaires and Sports Shri Sarbananda Sonowal, Union
Minister of State for Railways Shri Manoj Sinha was specially
present on the occasion at Silchar end. At New Delhi end, Member of
Parliament, Lok Sabha from Karimganj, Assam Shri Radheshyam Biswas, Member
Engineering Railway Board Shri V. K. Gupta, Member Traffic Railway Board Shri
Kundan Sinha were among those present on the occasion. Connection of Silchar by
BG railway line would not only benefit the people of Barak Valley, but would
lead to opening of new vistas in connection to the hitherto isolated states of
Tripura, Mizoram and Manipur.
Speaking on the occasion, Minister of Railways Shri Suresh Prabhakar Prabhu
said that it is an historic moment that people of South Assam are getting an
important railway connectivity with rest of the Nation. Today we are
introducing a new train between Guwahati and Silchar after conversion of
Lumding-Silchar Metre Gauge line into Broad Gauge. Goods trains are already
running in this section since March, 2015. More passenger trains will be
introduced in near future. This will fulfill the long cherished demand of the
people of Barak Valley to have a seamless connectivity.
Shri Suresh Prabhu said that Indian Railway is committed to improve its
infrastructure in North-Easter region and pointed out that all the eight
sisters of this region are dear to the heart of the people in the country. Rail
connectivity to North Eastern States has been made a mission item by the new
government, as we provided an all time high budget allotment of Rs.5200 crores
to the projects in this region in 2014-15 which is over 50% more than
2013-14. This tempo has been maintained in 2015-16 also by providing Rs.
5300 crores.
Shri Suresh Prabhu said that we are working expeditiously to connect all
Capitals of North Eastern States with railway connectivity. Earlier this
year Itanagar, the State Capital of Arunachal Pradesh was provided connectivity
with the National Capital through a direct train. Also the entire North Bank of
Brahmaputra has been brought on Broad Gauge with the commissioning of entire
Rangiya-Rangapara-North Lakhimpur – Murkongselek (510 km) Gauge Conversion
Project. Mega Block for conversion of Badarpur-Kumarghat-Agartala section has
been taken with effect from 01.10.2015. The Railway Minister pointed out
that the work is progressing as per target and Agartala, the Capital of Tripura
is all set to be on Broad Gauge by March, 2016. Along with this,
the Gauge Conversion of Kathakal-Bhairabi (Mizoram) and Arunachal (Station) –
Jiribam (Manipur) sections will also be completed and these two States i.e
Manipur and Mizoram will also come on Broad Gauge map of the country.
Shri Suresh Prabhu said that Railways have been commissioning about 133 km
Broad Gauge track every year in the North Eastern region in last 4-5 years. In
2014-15, a record was made when about 450 km of lines were commissioned. This
year again, we are all set to achieve a new record of commissioning of about
550 kilometres of Broad Gauge lines in this region.
Referring to the excellent relations between India and Bangladesh Shri Suresh
Prabhu said that Indian Railways will also work for better connectivity with
Bangladesh.
Shri Suresh Prabhu said that the development of infrastructure will also
help youth in a big way as they will get better opportunities for skill
development etc. The better railway connectivity will also provide better marketing
facilities. Railways have been playing a major role in serving the
infrastructural needs of the Northeast and will continue to contribute to the
socio-economical development of this region.
He congratulated all Railway personnel for completing this project
successfully despite many problems.
BACKGROUND
BREIF ABOUT THE PROJECT : -
The 210km Lumding-Silchar GC
project was sanctioned in the year 1996-97 at an initial cost of Rs.648 crores.
Declared as a National Project in 2004, the project connects the Barak Valley
of Assam by broad gauge track fulfilling a longstanding demand of the people of
this area.
Commencement of
passenger train service from Silchar to Lumding marks the completion of Phase-I
of this project.
The track passes through the verdant North Cachar hills almost parallel
to the old Metre Gauge alignment crisscrossing the MG alignment at many
locations in the first 100 kms between Lumding and Migrendisa. Thereafter, the
proposed BG alignment detours for 30 km before joining the MG alignment again
near Ditockchera.
The mega block for the phase-I i.e., Lumding-Silchar section (210 km) was taken
from 01.10.2014 for 6 months. The formation works and track linking works were
completed and engine rolling upto New Haflong (100 Km) was done on 12.01.2015
and subsequently upto Silchar on 13.03.2015. The first goods train was flagged
off by Hon’ble Minister of Railways Shri Suresh Prabhakar Prabhu on 27.3.2015.
Thereafter, more than 155 goods train have plied in the section.
Phase-2 of the total project
consists of gauge conversion of Badarpur-Kumarghat (118 km) and finger lines
Arunachal-Jiribam (50 Km), Baraigram-Dullabcherra (29 km) &
Karimganj-Mahishasan including Karimganj bye pass line (13.50 km). This phase
will be completed by 31.03.2016 for which mega block has already been taken
from 01.10.2015 for six months. The current estimated cost of the entire
project is around Rs.6000 cores.
Connection of Silchar by BG
railway line would not only benefit the people of Barak Valley, but would lead
to opening of new vistas in connection to the hitherto isolated states of
Tripura, Mizoram and Manipur.
Post a Comment